Perhitungan Rencana Biaya Teknis Reklamasi Timbunan Backfilling di Pit 3 Banko Barat di PT Bukit Asam.Tbk Tanjung Enim Kabupaten Muara Enimprovinsi Sumatera Selatan

Show simple item record

dc.contributor Fakultas Teknik
dc.contributor
dc.creator Wary, Asfim Tatak
dc.creator Ashari, Yunus
dc.creator Yuliadi, Yuliadi
dc.date 2018-08-09
dc.date.accessioned 2019-09-12T01:29:15Z
dc.date.available 2019-09-12T01:29:15Z
dc.identifier http://karyailmiah.unisba.ac.id/index.php/pertambangan/article/view/13089
dc.identifier.uri http://hdl.handle.net/123456789/22387
dc.description Abstract. Coal  mining  activity  is one  kind  of  that  cause  changes  in earth’s  landscape  and landform.  Reclamation  is needed  in order to restore  earth shapes,  thus  can  be  used  by  local  people.  Therefore,   government   issued  a regulation (PP 78, 2010). In the regulation,  it is stated that every mining company must conduct a reclamation. According to the spatial arrangement of Muara Enim Regency, this location is intended for production forest area. Where most of the IUP area of PT BukitAsam.Tbk production operations is a permanent production forest area and other Area of Use (APL). Based on consideration of several factors such as topography of research area and based on Spatial of Muara Enim Regency, the former mining area is planned to be converted into production forest area. The reclaimed / rehabilitated mining land in accordance with the Muara Enim Regency RTRW will be returned as the initial land hue or other alternative utilization. Where the reclaimed land is made into plantation area of 10 Ha. In this Final Project activity, the component calculation direct and indirect costs of reclamation on plan activities. Direct costs include land stewardship fees and revegetation costs, while indirect costs include of mobilization and demobilization costs of tools (2,5%),  costs of supervision (4,8%). The calculation of the cost component is done so that the use of reclamation guarantee provided by the company can be used appropriately. Based on these calculations, the estimated direct cost to carry out the reclamation of land area of 10 Ha is IDR 1,595,782,405 with details of land management fee of IDR 1,216,590,141 , revegetation cost IDR 262,355,554. The total indirect cost is Rp 116,836,709 with details of mobilization cost and tool demobilization (2,5%) amounting to Rp 36,973,642. Cost of supervision (5,4%) Rp 79,863,067Keywords: Reclamation, Revegetation, Direct Cost, Indirect Cost Plan Abstrak Industri  pertambangan  khususnya  bahan  galian  industri  semakin berkembang seiring dengan perkembangan pembangunan di Indonesia. Berkembangnya sektor industri pertambangan tersebut menimbulkan beberapa dampak negatif salah satunya adalah terjadinya perubahan lingkungan. Untuk menanggulangi dampak tersebut, kegiatan reklamasi menjadi hal yang sangat penting untuk dilakukan. Oleh karena itu, kajian rencana biaya reklamasi sangat diperlukan guna menunjang pelaksanaan reklamasi yang telah direncanakan. Berdasarkan Tata Ruang  Kabupaten Muara Enim lokasi penambangan  ini diperuntukan  area hutan produksi. Dimana sebagian besar wilayah IUP operasi produksi PT BukitAsam.Tbk merupakan wilayah kawasan hutan produksi tetap dan Area Penggunaan Lain (APL). Lahan bekas tambang yang direklamasi/direhabilitasi sesuai dengan RTRW Kabupaten Muara Enim akan dikembalikan sebagaimana rona awal lahan atau alternatif pemanfaatan  lain.  Luas  lahan pit 3 banko barat  yang  direklamasi  untuk  perkebunan kayu putih yaitu 10  Ha. Hasil perhitungan terhadap komponen biaya langsung dan biaya tidak langsung kegiatan rencana reklamasi. Biaya langsung  meliputi  biaya  penatagunaan  lahan  dan  biaya  revegetasi, sedangkan biaya tidak langsung meliputi biaya mobilisasi dan demobilisasi alat (2,5%), Biaya supervisi (4,8%). Perhitungan komponen biaya tersebut dilakukan agar penggunaan jaminan reklamasi yang telah disediakan perusahaan dapat digunakan secara tepat guna. Didapatkan Biaya Rencana Reklamasi seluas 10 Ha adalah sebesar Rp  1.595.782.405 dengan rincian biaya penataan lahan sebesar Rp 1.216.590.141  biaya revegetasi Rp 262.355.554. Adapun total  biaya  tidak  langsung  adalah sebesar Rp 116.836.709 dengan rincian biaya mobilisasi dan demobilisasi alat (2,5%) sebesar Rp 36.973.642. Biaya supervisi (5,4%) Rp 79.863.067Kata  Kunci : Rencana  Reklamasi,  Biaya  Langsung,  Biaya  Tidak Langsung, dan Fungsi Lahan.
dc.description Abstract. Coal  mining  activity  is one  kind  of  that  cause  changes  in earth’s  landscape  and landform.  Reclamation  is needed  in order to restore  earth shapes,  thus  can  be  used  by  local  people.  Therefore,   government   issued  a regulation (PP 78, 2010). In the regulation,  it is stated that every mining company must conduct a reclamation. According to the spatial arrangement of Muara Enim Regency, this location is intended for production forest area. Where most of the IUP area of PT BukitAsam.Tbk production operations is a permanent production forest area and other Area of Use (APL). Based on consideration of several factors such as topography of research area and based on Spatial of Muara Enim Regency, the former mining area is planned to be converted into production forest area. The reclaimed / rehabilitated mining land in accordance with the Muara Enim Regency RTRW will be returned as the initial land hue or other alternative utilization. Where the reclaimed land is made into plantation area of 10 Ha. In this Final Project activity, the component calculation direct and indirect costs of reclamation on plan activities. Direct costs include land stewardship fees and revegetation costs, while indirect costs include of mobilization and demobilization costs of tools (2,5%),  costs of supervision (4,8%). The calculation of the cost component is done so that the use of reclamation guarantee provided by the company can be used appropriately. Based on these calculations, the estimated direct cost to carry out the reclamation of land area of 10 Ha is IDR 1,595,782,405 with details of land management fee of IDR 1,216,590,141 , revegetation cost IDR 262,355,554. The total indirect cost is Rp 116,836,709 with details of mobilization cost and tool demobilization (2,5%) amounting to Rp 36,973,642. Cost of supervision (5,4%) Rp 79,863,067
dc.format application/pdf
dc.language eng
dc.publisher Universitas Islam Bandung
dc.relation http://karyailmiah.unisba.ac.id/index.php/pertambangan/article/view/13089/pdf
dc.rights Copyright (c) 2018 Prosiding Teknik Pertambangan
dc.source Prosiding Teknik Pertambangan; Vol 4, No 2, Prosiding Teknik Pertambangan (Agustus, 2018); 586-591
dc.source Prosiding Teknik Pertambangan; Vol 4, No 2, Prosiding Teknik Pertambangan (Agustus, 2018); 586-591
dc.source 2460-6499
dc.subject Teknik Pertambangan
dc.subject Rencana Reklamasi, Biaya Langsung, Biaya Tidak Langsung, dan Fungsi Lahan
dc.subject
dc.subject Reclamation, Revegetation, Direct Cost, Indirect Cost Plan
dc.title Perhitungan Rencana Biaya Teknis Reklamasi Timbunan Backfilling di Pit 3 Banko Barat di PT Bukit Asam.Tbk Tanjung Enim Kabupaten Muara Enimprovinsi Sumatera Selatan
dc.title PERHITUNGAN RENCANA BIAYA TEKNIS REKLAMASI TIMBUNAN BACKFILLING DI PIT 3 BANKO BARAT DI PT. BUKIT ASAM.Tbk TANJUNG ENIM KABUPATEN MUARA ENIMPROVINSI SUMATERA SELATAN
dc.type info:eu-repo/semantics/article
dc.type info:eu-repo/semantics/publishedVersion
dc.type Peer-reviewed Article
dc.type Kuantitatif
dc.type


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search Unisba Repository


Browse

My Account